Object type | Types of work |
---|---|
Blast Furnace Shop | Overhaul-reconditioning repair of the Blast Furnace (BF № 3) with constructing of the new Foundry Yard. Overhaul repair of the Blast Furnace (BF № 1) |
Blast Furnace (BF № 2): mounting of the Blast Furnace’s gas-cleaning units; mounting of the gas-cleaning complex with electric filter; manufacturing and mounting of steel structures Manufacturer of the equipment: «Mi-Fi-Bu» (Slovakia). | |
Overhaul-reconditioning repair of the Blast Furnace No. 1. (replacement of the furnace, reconstruction of the foundry yard, bin trestle, assembly of the electric precipitators and etc.). Year of 2012-2013. | |
Furnace cooling system repair during second-category overhaul repair of the blast furnace No.2. Year of 2012-2013. | |
Construction of the pig iron desulphurization unit. Year of 2015. | |
Sinter Plant | Reconstruction of the sinter plant with mounting of 2 new sinter machines |
Repair works at Sinter Shop facilities (repair of the equipment and steel structures of sintering machines, repair of the bottom bins and conveyors). Year of 2012-2013. | |
Repair of the bin trestle. Year of 2012-2013. | |
Hot Metal Teeming Machines | Reconstruction of 4 hot metal teeming machines |
Other DMSS facilities
Find out all about
Donbassmontazhspetsstroy
in 3 minutes