Object type | Types of work |
---|---|
Steam Pipeline | Steam pipelines reconstruction (P= 10 MPa; t= 5400C): - the boiler (БКЗ-160-100 ПТ) steam pipelines bends replacement on the stations № 6, 8; - the boiler (БКЗ-160-100 ПТ) absorbing pipeline reconstruction on the station № 7; - smoke exhauster (БКЗ- 100 ПТ) repair. |
Boiler Station № 6 | Boiler of the station № 6 (БКЗ 160-100 ПТ; P = 10; t =5400C): replacement of the high pressure convective superheater of the 4th stage coils |
Boiler Station № 8 | Boiler of the station № 8 (БКЗ 160-100 ПТ): - screens repair; - furnace cover repair. |
Other DMSS facilities
Find out all about
Donbassmontazhspetsstroy
in 3 minutes