Object type | Types of work |
---|---|
Gas-Cleaning Plant of the Blast Furnaces | Reconstruction of the Blast Furnaces circulating cycle |
Coke Battery | Mounting and demounting of the Coke battery № 4 |
Cooling stack | Manufacturing and mounting of the steel structures for the cooling stack (БГ-1200) |
Thermal Power Main Pipe | - replacement of the supporting steel structures under pipelines; - overhaul repair of the internal communications; - reconstruction of the accumulator boxes of deaerated water with installation of the deaerating columns; - expansion of the thermal Power Main Building with erection of the standby boiler: - mounting of the steel structures of the body; - mounting of the reinforced concrete structures of the plates and boards. Manufacturing and mounting of the steel structures for warehouses of refractory materials, granulated pitch, concentration department, gallery № 5; Mounting of the special room for transposition of the Coke batteries № 1-9. |