Object type | Types of work |
---|---|
60-tons converter | Assembly, welding, dismantling, erection and commissioning Replacement of the Converter: - Pre-assembly and welding of the converter’s vessel and support ring; - Control assembly of the new converter equipment; - Dismantling of the existing converter equipment – 60 tons; - Assembly of the converter’s equipment – 60 tons. |
Blast Furnace Shop | Reconstruction of the Blast Furnace Shop No.2. Year of 2015 – till the present time. Mechanical, power supply part. Central unit, Foundry Yard. |