Construction facilities

Arcelor Mittal Steel – Annaba, Algeria

Object type Types of work
60-tons converter Assembly, welding, dismantling, erection and commissioning Replacement of the Converter: - Pre-assembly and welding of the converter’s vessel and support ring; - Control assembly of the new converter equipment; - Dismantling of the existing converter equipment – 60 tons; - Assembly of the converter’s equipment – 60 tons.
Blast Furnace Shop Reconstruction of the Blast Furnace Shop No.2. Year of 2015 – till the present time. Mechanical, power supply part. Central unit, Foundry Yard.

Other DMSS facilities

Find out all about
Donbassmontazhspetsstroy
in 3 minutes

Download