Object type | Types of work |
---|---|
Blast Furnace Shop | Reconstruction of Gas-Cleaning Plant of Blast Furnace (BF № 1) |
Blast Furnace (BF № 4): construction of the gas-cleaning plant | |
Oxygen-Converter Shop | Mounting of the equipment and adjusting of the power supply block: - external circuits, total productivity: - as per condensate - 360 t. per hour; - as per feeding water - 190 t. per hour. |
Mounting of the equipment and internal shop’s pipelines | |
Construction of the air-separating plant (ВРУ-60) with external industrial lines. Input capacity is 60 000 cub.m. per hour of oxygen | |
Construction of the 1-t stage of automatic gas-filling oxygen plant | |
Construction of the automatic gas-filling oxygen plant (reequipping of automobiles in to gas -150 Nos. per year) | |
Reconstruction of the Oxygen Shop with construction of the air-separating plant (ВРУ-60) together with 4 nitrogen compressors (model К-42/61-2) and 2 air compressors (model К-1700/61-1-2). Input capacity is 60 000 cub.м per hour | |
Construction of the Slab Continuous Casting Machine. Manufacturer of the equipment: “VAI” (Austria). | |
Cattle Farms | Reconstruction of the buildings and premises for the Cattle Farms of the agricultural enterprise of the OJSC «Ilyich Iron & Steel Works», replacement of the worn-out steel structures of the pipe lines and equipment |
Lime-Burning Shop | Construction of the Lime Warehouse |
Mounting of the 2 compressors (ВВ-Ш-УЗ) having 1200 t/ day of lime capacity | |
Railway Shop | Construction of the servicing shop and a station with drying machine |
Steel Structures Shop | Steel Structures Shop № 2: Gasification of the boiler station, input capacity is 155,4 МW |
Gas-Cleaning Plant | Construction of the Gas-Cleaning Plant behind Sinter Machines № 4 and № 5 with installation of the electric filters Manufacturer of the equipment: «Speyk» (France). |
Construction of the Gas-Cleaning Plant behind the Sinter Machines № 2, 3 with installation of electro filters Manufacturer of the equipment: «Speyk» (France). | |
Mounting of the Gas-Cleaning plant behind Sinter Machine №1 and collector В-8 Manufacturer of the equipment: «Speyk» (France). | |
Boiler Station | Construction of the Boiler Station in the hotel “Druzhba” and in the swimming pool “Neptun” |
Thermal Power Main Line - Air Station | Mounting of the turbo air blowing with compressor (model -К 5500-42-1) and turbine (model К 22-90 ) Manufacturer of the equipment: «NZL» (S.Peterburg). |
Sinter Plant | Reconstruction of the Sinter Plant; Mounting of the Gas-Cleaning Plant with electric filters Manufacturer of the equipment: «Speyk» (France). |
Rolling Mill «1700» | Construction of the plant for screening of rolled products on the industrial roller-bed with grease and lubrication systems |