Construction facilities

OJSC «Ilyich Iron & Steel Works», Ukraine

Object type Types of work
Blast Furnace Shop Reconstruction of Gas-Cleaning Plant of Blast Furnace (BF № 1)
Blast Furnace (BF № 4): construction of the gas-cleaning plant
Oxygen-Converter Shop Mounting of the equipment and adjusting of the power supply block: - external circuits, total productivity: - as per condensate - 360 t. per hour; - as per feeding water - 190 t. per hour.
Mounting of the equipment and internal shop’s pipelines
Construction of the air-separating plant (ВРУ-60) with external industrial lines. Input capacity is 60 000 cub.m. per hour of oxygen
Construction of the 1-t stage of automatic gas-filling oxygen plant
Construction of the automatic gas-filling oxygen plant (reequipping of automobiles in to gas -150 Nos. per year)
Reconstruction of the Oxygen Shop with construction of the air-separating plant (ВРУ-60) together with 4 nitrogen compressors (model К-42/61-2) and 2 air compressors (model К-1700/61-1-2). Input capacity is 60 000 cub.м per hour
Construction of the Slab Continuous Casting Machine. Manufacturer of the equipment: “VAI” (Austria).
Cattle Farms Reconstruction of the buildings and premises for the Cattle Farms of the agricultural enterprise of the OJSC «Ilyich Iron & Steel Works», replacement of the worn-out steel structures of the pipe lines and equipment
Lime-Burning Shop Construction of the Lime Warehouse
Mounting of the 2 compressors (ВВ-Ш-УЗ) having 1200 t/ day of lime capacity
Railway Shop Construction of the servicing shop and a station with drying machine
Steel Structures Shop Steel Structures Shop № 2: Gasification of the boiler station, input capacity is 155,4 МW
Gas-Cleaning Plant Construction of the Gas-Cleaning Plant behind Sinter Machines № 4 and № 5 with installation of the electric filters Manufacturer of the equipment: «Speyk» (France).
Construction of the Gas-Cleaning Plant behind the Sinter Machines № 2, 3 with installation of electro filters Manufacturer of the equipment: «Speyk» (France).
Mounting of the Gas-Cleaning plant behind Sinter Machine №1 and collector В-8 Manufacturer of the equipment: «Speyk» (France).
Boiler Station Construction of the Boiler Station in the hotel “Druzhba” and in the swimming pool “Neptun”
Thermal Power Main Line - Air Station Mounting of the turbo air blowing with compressor (model -К 5500-42-1) and turbine (model К 22-90 ) Manufacturer of the equipment: «NZL» (S.Peterburg).
Sinter Plant Reconstruction of the Sinter Plant; Mounting of the Gas-Cleaning Plant with electric filters Manufacturer of the equipment: «Speyk» (France).
Rolling Mill «1700» Construction of the plant for screening of rolled products on the industrial roller-bed with grease and lubrication systems