Construction facilities

OJSC «Alchevskiy Iron & Steel Works», Ukraine

Object type Types of work
Steel Continuous Casting Shop Reconstruction of the Steel Continuous Casting Shop with installation 2-strand Continuous Casting Machine and “Ladle-Furnace” unit. Manufacturing and mounting of steel structures. Execution of the scheduled works for erection of the vacuum degassing unit Manufacturer of the equipment: «VAI» (Austria).
Rolling Mill “2800” Reconstruction of the Rolling Mill «2800» into «3000» with replacement of all equipment of the rolling line in the quantity of 6800 tons. Reconstruction of the complex of the Steel Continuous Casting Shop with installation of load-lifting mechanisms, including 2 cranes (capacity 450/100/20), two 2-strand continuous casting machines equipped with two «Ladle-Furnace» units and vacuum degassing plant. Execution of the scheduled works for mounting and demounting of the technological equipment. Manufacturer of the equipment: «VAI» (Austria).
Rolling Mill “3000” Mounting of the water descaling unit
Blast Furnace Reconstruction of the Blast Furnaces (BF №1,5) with installation of the technological equipment of the Foundry Yards, hydraulics and lubrication systems including: - replacement of the steel structures on the charge supply maintenance sites; - replacement of the charge supply hoppers; - replacement of heating pipelines; - replacement of the ventilation and aspiration pipelines; - connecting-and-switch of the water filters; - replacement of the steel structures of the charge supply sites; - mounting of the power systems and hydraulic pneumatic control system of the continuous casting machine № 1. Manufacturing and mounting of steel structures. Development of Construction Arrangement Project for erection of the construction communications and technological equipment for installation of PCI unit for Blast Furnaces No.1-5.
Converter Shop Development of the Construction Arrangement Project as a part of detail engineering for erection of the body and technological equipment of the Converter Shop
Sinter Plant Reconstruction of the Sinter Machine №2
PCI Unit Pulverized coal preparation and injection unit for blast furnaces. Assembly of the technological equipment, steel structures and pipelines. Year of 2011.
Desulphurization Unit Assembly of the equipment. Year of 2011.